Coronavirus closures have left many large buildings inactive, including malls, sporting venues, and concert halls. As a result, some systems inside those buildings now run on different schedules, or not at all. This can cause serious problems. Many companies also had no plan of action in place for a pandemic or other emergency.
Scott Bryan, technical sales manager for water treatment at Cortec®, answered questions from Pumps & Systems about these problems and how to solve them.
Pumps & Systems: Generally, what has been done to the pumps and systems for major buildings such as malls now that they could be empty?
Bryan: These buildings never experience a facility-wide shutdown for an extended period. Because of this, most likely no preservation plan existed, and crews simply shut the systems down.
Layup alternatives exist for boiler and cooling water systems. A facility’s water treatment company or mechanical contractor could have recommended options, such as using a desiccant in the boilers. Still, it’s highly unlikely that anyone did more than preserve the boiler.
P&S: Besides a shopping mall, what other types of buildings are subjected to this?
Bryan: We have seen large office buildings, hotels, universities, and school districts shut down for extended periods.
P&S: What hazards would this bring?
Bryan: With a Preservation Plan, our main focus is minimizing corrosion while the facility isn’t running. Without an adequate program, corrosion in the water, steam, and condensate systems will cause startup issues.
Corrosion isn’t the only concern. If you shut down a system and leave it full of water, microbial growth can develop in the water. This growth creates both health concerns and additional corrosion issues.
P&S: What are the best ways to ensure effective ways of preservation for equipment?
Bryan: Start by developing a Preservation Plan. From there, you can choose a Wet Layup or a Dry Layup based on the individual factors at each facility. Cortec® takes part in many of these plans and helps customers better understand their options.
P&S: What safety practices must be ensured while doing that?
Bryan: Follow normal shutdown procedures first. Cortec® products are relatively safe to handle and use in their various applications. We recommend normal PPE, such as safety glasses and gloves, when you handle the products directly.
The products also offer an added benefit for extended outages. You don’t need to remove them before starting the system back up. This saves time and avoids the disposal issues that come with alternative preservation methods.
This article is sourced from Pumps & Systems.