The project calls for the construction of a 207 room, 5-star hotel in Plot No. 3935794 in the Jumeirah Lake Towers (JLT) development. The high rise will be iconic in design. The building is of 4 basements + ground + 2 level podium + 44-storey + mechanical floor. It will also house residential units.
Application
MCI®-2005 was used in all substructure elements.
Conclusion
MCI®-2005 was used in over 5,000 m3 of concrete. MCI-2005 proven effectiveness was the driver for using it in the project.
Consultant Archgroup
Concrete Supplier Emirates Beton
Product MCI®-2005