Challenge
The project calls for the construction of a 57-storey serviced apartment tower with 320 units of 1, 2, 3 & 4 bedrooms located on Mohammed Bin Rashid Boulevard. The tower will sit on a 3-level podium. It is located on plot no.49. The building will be connected via an air-conditioned bridge to the existing Vida Hotel in Downtown Dubai.
Application
MCI®-2005 was used in the concrete substructure for over 10,000 m3.
Conclusion
MCI®-2005’s proven effectiveness was the driver for using it in the project and was used as an alternative to the specified Calcium Nitrite.
Date June 2016
Concrete Supplier Unibeton
Consultant NORR Group
Contractor Al Basti & Muktha
Location Dubai – Downtown