Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
    • Asset Integrity Assurance
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
    • Military
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies • MCI Construction   »   Rove Hotel Application
Published by Cortec Middle East on December 15, 2020
Categories
  • case studies
  • MCI Construction
Tags
rovehotel-healthcare

Rove Hotel Application

Problem
The Rove Hotel is the first of five hotels being constructed by Emaar. These budget friendly hotels are located in Dubai Downtown, near Dubai Mall and the world’s tallest building, Burj Kalifa. This region has extremely saline soil, with some areas reaching 90,000 ppm of chloride content. In contrast, the Atlantic Ocean contains approximately 20,000 ppm of chlorides. These exposure conditions necessitated special considerations for the substructure mix design to ensure urability. MCI®-2005 was specified to increase the expected durability and service life of the structure.

Application
MCI®-2005 was used in more than 5,000 m3 of the substructure concrete.

Conclusion
MCI®-2005 was specified and used in the project due to its ease of application and ability to improve service life of the substructure. Since this hotel was built, three more have been completed using the same design.

Location
Abu Dhabi – Zabeel, UAE

Ready Mix Supplier
Unibeton

Consultant
Arch Group

Contractor
Shapoorji Pallonji

Product
MCI®-2005

Date
October 2015

Contact Us
Share
1
Cortec Middle East
Cortec Middle East

Related posts

Naval Base Box Preservation

Naval Base Box Preservation

January 11, 2023

Naval Base Box Preservation


Read more
Extending Service Life

Extending Service Life

January 11, 2023

Extending Service Life : Charleswood Bridge


Read more
Office Chair Protection

Office Chair Protection

December 12, 2022

Office Chair Protection


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
SIDRA TOWER, OFFICE 1307,
SHEIKH ZAYED ROAD
P.O. BOX 115133, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV