Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
    • Asset Integrity Assurance
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
    • Military
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies   »   Restoration of Bullet Train Structures
Published by Cortec Middle East on September 25, 2024
Categories
  • case studies
Tags
  • Restoration of Bullet Train Structures
Restoration of Bullet Train Structures

Restoration of Bullet Train Structures

Restoration of Bullet Train Structures

PROBLEM

Seashore sand (NaCl content is 2-3 kg/m3 [0.12-0.19 lbs/ft3]) was used in the concrete for construction of the bullet train bridges. Water to concrete ratios exceeded 70%, which created poor quality concrete. The structure exhibited numerous spalled areas with exposed corroded rebar. Not only did the spalled and corroded areas need repair, but they also needed to be protected from further corrosion.

APPLICATION

The MCI® products selected for this project were:
• MCI®-2023: 32.90 kg (72.5 lbs)
• MCI®-2020: 31.02 kg (68.4 lbs)
• MCI®-2005: 3.69 kg (8.1 lbs)
(mixed with Tough Ace Emulsion produced by LION Co.)

CONCLUSION

More than sixty treatment products developed by fifteen manufacturers were examined for the project. Out of the systems and products tested, Cortec® MCI® products offered the highest performance levels and were chosen for corrosion control of the Bullet Train structures.

PRODUCTS

MCI®-2005
MCI®-2020
MCI®-2023

Contact Us
Share
0
Cortec Middle East

Related posts

High Rise Building Restoration

High Rise Building Restoration

September 23, 2025

High Rise Building Restoration


Read more
Protection of Electrical Cabinets

Protection of Electrical Cabinets

September 23, 2025

Protection of Electrical Cabinets


Read more
Cleaning and Preservation of Spare Parts

Cleaning and Preservation of Spare Parts

August 24, 2025

Cleaning and Preservation of Spare Parts


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
2411 Tower B, Jafza One,
Jebel Ali Freezone, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV