Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
    • Military
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies • Oil and Gas   »   Refinery Equipment Preservation
December 11, 2019

Refinery Equipment Preservation

Challenge

A leading refinery wanted to maintain the integrity of valuable assets and prevent deterioration due to corrosion whilst maintaining the operational readiness of equipment to facilitate quick turn-around once needed. The facility is located in a challenging environment: next to the ocean, experiencing temperatures up to 50C, high airborne chlorides, and up to 100% humidity. The large volume of assets meant warehouse inventory was not possible, existing outdoor racking was the only option.

Effective storage and preservation of assets and equipment are an essential part of the inventory management system. A robust well-planned inventory preservation system increases the lifecycle of the products at the same time decreasing the costs of storage and preservation. Cortec’s solutions to inventory management come in many different shapes, sizes, and formats. Learn how to plan and execute an inventory protection plan to avoid losses from corrosion and different elements.

Application

The Cortec “Clean, Preserve & Protect” programme that is widely followed by Oil & Gas Operators in the Middle East was proposed; consisting of a Turn-key solution including the supply of all products and service applications. Preservation procedures were developed for long term preservation of equipment which is to be stored for commissioning or re-commissioning up to five years into the future.

Three stages of the process were identified and implemented by a skilled team of service applicators:

1. Rust Removal Station – Immerse assets in an epoxy coated bath filled with VpCI®-422

2. Power Wash Station – Power wash and neutralize surfaces of assets with 10% VpCI®-4143.

3. Preservation Station – Application of rust preventatives, emitters and wrapping of equipment

Scope of project included:

  • Flanges
  • Elbows
  • Valves
  • Heat Exchanger tube bundles
  • Trays
  • Nuts & Bolts

Conclusion

The client was satisfied that the equipment was adequately, yet economically preserved in order to maintain its technical integrity for the period standing idle and to make resuming production as straightforward as possible. The rust removal process was cost-effective and simple to implement and the client is currently considering Cortec’s Clean, Preserve, Protect system for wide-scale implementation.

Location Middle East

Date 2015

Distributor Texel Energy Services

Products 

  • VpCI®-422
  • VpCI®-414
  • VpCI®-368
  • VpCI®-337
  • Milcorr Ecopouch
Contact Us
Share
0
Cortec Middle East
Cortec Middle East

Related posts

December 24, 2020

Preserving Damaged Rebar in Dubai Creek Harbor Utility Project


Read more
December 15, 2020

Rove Hotel Application


Read more
August 11, 2020

Preservation of Land Rig in Algeria


Read more

Comments are closed.


Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
SIDRA TOWER, OFFICE 1307,
SHEIKH ZAYED ROAD
P.O. BOX 115133, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright 2020 Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



      Download Layup Manuals

      Select Manual* :


      Offshore Rig Layup PR




      Layup of Land Based Drilling Rigs PR




      Request a Quote


      Talk To Our Experts


      Subscribe Now

      Apply Now

      Upload Your CV