Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
    • Military
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies   »   Reem Island
Published by Cortec Middle East on December 11, 2019
Categories
  • case studies
Tags
Reem Island

Reem Island

Overview

Abu Dhabi Reem Island has more than 100 towers consisting of 1.4 million square metres of office space, and 850,000 square metres of retail and community facilities the majority of which are complete with the balance expected to be completed within two years. Four district cooling plants with a capacity greater than 1,000m3 are proposed for the site, two of which are complete but the towers they are to support are not. The end clients had a requirement to mothball the facility for up to two years.

Application 

Cortec VpCI technology was proposed on Reem Island to provide an environmentally friendly, cost effective solution:

  • VpCI-649BD was proposed and accepted by the client
  • A dosage of 0.4% was used to achieve 24 months of protection
  • A total quantity of 2,970 Gallons equal to 164 drums was required.

Conclusion 

Tabreed – Cooltech Energy adopted preservation (Wet Lay-up) with Cortec VpCI technology as it provided long term preservation against corrosion whilst minimising inspection, costs and replacement Vs traditional methods with effective corrosion protection on ferrous and non-ferrous lines in the district cooling system.

Date 2011

Distributor Kanoo Group

Location: Abu Dhabi, UAE

Client Tamouh, Reem Investments and Aldar Properties

Product VpCI-649 BD

Contact Us
Share
0
Cortec Middle East
Cortec Middle East

Related posts

Long Term Lay-up
June 20, 2022

Long Term Layup – Optimum Long Term Layup Program at a BHP Copper Mine


Read more
Bearing Parts Preservation
June 10, 2022

Bearing Parts Preservation


Read more
VpCI® Packaging
June 8, 2022

Steel Bar Preservation


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
SIDRA TOWER, OFFICE 1307,
SHEIKH ZAYED ROAD
P.O. BOX 115133, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV