Challenge
The project is located very close to the sea, where the salinity level in the groundwater table is high. This prestigious project consists of four commercial and residential buildings comprised of 2 basements, a ground floor, a podium, and 10 floors. MCI®-2005 was proposed as an alternative to the originally specified calcium nitrites due to its low dose and practicality.
Application
MCI®-2005 was used in the substructure of the project.
Conclusion
Cortec’s MCI®-2005 technical and practical advantages have convinced the consultants to approve it as an alternative to the originally specified calcium nitrites.
Product MCI®-2005