Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
    • Asset Integrity Assurance
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
    • Military
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies • Oil and Gas   »   Preservation of J-Tubes on Offshore Jackets
Published by Cortec Middle East on June 10, 2020
Categories
  • case studies
  • Oil and Gas
Tags
stacked rigs Scotland

Preservation of J-Tubes on Offshore Jackets

Challenge
The client needed to preserve piping internals for JTubes on their jackets (support frames for offshore platforms) built for installation in an offshore field development project. The jackets were fabricated onshore and sailed offshore for the final fit-up, requiring a preservation period of up to three years.

Application
Cortec® VpCI® Technology was selected for its superior preservation abilities within closed and sealed environments such as J-Tubes, which are used for carrying subsea cables to topside structures. VpCI®-649 BD was identified in particular for the protection of the J-Tube internals. Upon completion of the float-over jacket to which the 400 mm (15.7 in.) diameter, 30 m (32.8 yds.) long J-Tubes would be attached, and after subsequent offshore installation and placing of the 30,000 MT topsides, the tubes would remain sealed and preserved until the subsea cables were ready for installation.

Conclusion
Cortec® VpCI® has a long track record with the national oil companies in the UAE. Cortec® Middle East and Kanoo were happy to support them in achieving effective preservation in the harsh climatic conditions found in the Arabian Peninsula.

Location: Abu Dhabi, UAE

Date: 2017

Product
VpCI®-649 BD

Contact Us
Share
0
Cortec Middle East
Cortec Middle East

Related posts

Naval Base Box Preservation

Naval Base Box Preservation

January 11, 2023

Naval Base Box Preservation


Read more
Extending Service Life

Extending Service Life

January 11, 2023

Extending Service Life : Charleswood Bridge


Read more
Office Chair Protection

Office Chair Protection

December 12, 2022

Office Chair Protection


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
SIDRA TOWER, OFFICE 1307,
SHEIKH ZAYED ROAD
P.O. BOX 115133, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV