Challenge
Application
VpCI®-337 was identified as the preferred product to unify across all modules as it provided long term multimetal protection.
After hydro testing, the client would drain and air blow water from the piping before fogging VpCI®-337 through the end of the piping module. The module was divided into test packs, where pipe ID and pipe run were known, the volume of piping was calculated and 1L/m3 was fogged to the system
Conclusion
Distributor Texel Energy Services
Products VpCI®-337