The city of Milwaukee’s Plankenton Avenue Parking Ramp was deteriorating. Steel rebar inside it was corroding from deicing salt carried in on automobiles. Because the ramp sits in the heart of downtown Milwaukee, it serves as a valuable source of revenue for the city. Given this, officials wanted a fast, economical way to renovate and protect the structure while minimizing downtime. Both the specifying engineer and the city agreed the renovation needed to use the best available products and procedures. MCI®-2020 became a key part of that renovation system.
Urban parking ramps endure a particularly aggressive form of corrosion risk each winter. Vehicles entering the structure carry deicing salt on their tires and undercarriages. This deposits chloride-laden residue directly onto the concrete decks. Over time, this salt works its way into the concrete and reaches the embedded rebar. There, it triggers corrosion that expands the steel and cracks the surrounding concrete from within.
For a high-traffic, revenue-generating structure like the Plankenton Avenue ramp, extended closures carry a real financial cost. Because of this, the city needed a renovation approach that could restore the structure’s integrity quickly. It also needed to avoid the extended downtime that more invasive repair methods might require.
The renovation contractor applied MCI®-2020 to the concrete decks at a rate of 150 square feet per gallon (4 m²/L). This straightforward application process allowed crews to treat large areas of the parking structure efficiently. It also required no extensive surface preparation or specialized equipment.
Why MCI®-2020:
As a Migrating Corrosion Inhibitor, MCI®-2020 penetrates the concrete matrix. From there, it travels to the depth of embedded reinforcing steel. This meant the product could protect the rebar directly, rather than simply forming a surface barrier that could wear away under continued vehicle traffic and salt exposure. Because the application process required no demolition or extensive surface work, the city could treat the entire structure quickly. This minimized the downtime a full-scale structural repair would otherwise demand.
MCI®-2020 migrated through the concrete to form a protective, corrosion-inhibiting barrier directly on the structural steel. The city selected MCI®-2020 as part of the renovation system for a clear reason: its corrosion-inhibiting properties would extend the structure’s life and reduce future maintenance needs.
This project demonstrates how a migrating corrosion inhibitor can renovate and protect a high-traffic structure without extended downtime. For cities managing revenue-generating parking infrastructure, this case highlights several practical lessons: