Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
    • Asset Integrity Assurance
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies • Construction   »   Park View Saadiyat
Published by Cortec Middle East on December 11, 2019
Categories
  • case studies
  • Construction
Tags
Untitled design (14)

Park View Saadiyat

Deira Waterfront Concrete Piling Protection with MCI®-2005

Overview

Concrete piling corrosion protection formed an important part of the construction strategy for four buildings within the Deira Waterfront Development. The project includes a mix of hotel, commercial, residential, and retail spaces.

Because piling forms a critical part of the building foundations, the project team selected Cortec® MCI® technology to provide corrosion protection within the piling concrete.

In total, the project incorporated MCI®-2005 into more than 15,000 m³ of piling concrete.

Why Concrete Piling Corrosion Protection Matters

Reinforcing steel provides strength to concrete piles. However, corrosion can affect embedded reinforcement and reduce the long-term durability of reinforced concrete.

Therefore, concrete piling corrosion protection can form part of the original construction strategy. By incorporating corrosion protection during concrete placement, project teams can address reinforcement protection from the beginning.

For the Deira Waterfront Development, the project team selected MCI®-2005 based on its proven effectiveness.

Application

The project used Cortec® MCI® technology in the piling works.

The team incorporated MCI®-2005 into the piling concrete. Overall, more than 15,000 m³ of concrete received the product.

As a result, the project integrated corrosion protection directly into a substantial volume of piling concrete.

Concrete Piling Corrosion Protection with MCI®-2005

The project team needed a proven product for the piling works. Therefore, they selected MCI®-2005.

Rather than treating the concrete after construction, the team incorporated the product during the piling phase. This approach made concrete piling corrosion protection part of the original construction process.

Furthermore, the application covered more than 15,000 m³ of piling concrete across the development.

Why MCI®-2005 Was Selected

Proven Effectiveness
The proven effectiveness of MCI®-2005 was the main reason for selecting it for this project.

Large-Scale Application
The project used MCI®-2005 in more than 15,000 m³ of piling concrete. Therefore, the product formed a significant part of the piling works.

Protection During Construction
The project team incorporated MCI®-2005 into the piling concrete during construction. Consequently, the corrosion protection strategy became part of the original concrete works.

Suitable for a Mixed-Use Development
The development includes hotel, commercial, residential, and retail buildings. As a result, the piling works support several different building uses within the same development.

Benefits of Concrete Piling Corrosion Protection

A planned concrete piling corrosion protection strategy helps project teams address reinforcement protection during construction.

In this project, MCI®-2005 formed part of the piling works across a large volume of concrete. Moreover, selecting a proven corrosion inhibitor allowed the project team to establish its protection strategy from the foundation stage.

The application demonstrates how corrosion protection can become an integral part of major reinforced concrete construction projects.

Conclusion

The Deira Waterfront Development used MCI®-2005 in more than 15,000 m³ of piling concrete.

The project team selected the product because of its proven effectiveness. Furthermore, using MCI®-2005 during piling integrated corrosion protection directly into the foundation construction process.

Overall, the concrete piling corrosion protection strategy supported the project’s approach to protecting reinforced concrete from the earliest stage of construction.

Why This Case Matters for Developers and Engineers

  • The development includes four mixed-use buildings.
  • The buildings will contain hotel, commercial, residential, and retail spaces.
  • The project used MCI®-2005 in its piling works.
  • More than 15,000 m³ of piling concrete incorporated MCI®-2005.
  • Proven effectiveness drove the product selection.
  • The project integrated corrosion protection during the construction phase.

Frequently Asked Questions

What is concrete piling corrosion protection?
Concrete piling corrosion protection focuses on protecting reinforcing steel within the concrete piles against corrosion.

Which corrosion inhibitor did the project use?
The project used MCI®-2005 in the piling concrete.

How much concrete incorporated MCI®-2005?
The project used MCI®-2005 in more than 15,000 m³ of piling concrete.

Why was MCI®-2005 selected?
The project selected MCI®-2005 because of its proven effectiveness.

What buildings are included in the development?
The project includes four buildings with hotel, commercial, residential, and retail spaces.

Key Takeaways

  • The project includes four buildings within the Deira Waterfront Development.
  • The development combines hotel, commercial, residential, and retail uses.
  • MCI®-2005 was incorporated into the piling concrete.
  • More than 15,000 m³ of concrete received MCI®-2005.
  • Proven effectiveness drove the selection of MCI®-2005.
  • The project established concrete piling corrosion protection during construction.

Project Partners

Concrete Supplier: Reem Readymix

Consultant: MZ Architects

Cortec® Product Used

  • MCI®-2005
Contact Us
Share
0
Cortec Middle East

Related posts

High Rise Building Restoration

High Rise Building Restoration

September 23, 2025

High Rise Building Restoration


Read more
Protection of Electrical Cabinets

Protection of Electrical Cabinets

September 23, 2025

Protection of Electrical Cabinets


Read more
Cleaning and Preservation of Spare Parts

Cleaning and Preservation of Spare Parts

August 24, 2025

Cleaning and Preservation of Spare Parts


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
2411 Tower B, Jafza One,
Jebel Ali Freezone, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV