Concrete piling corrosion protection formed an important part of the construction strategy for four buildings within the Deira Waterfront Development. The project includes a mix of hotel, commercial, residential, and retail spaces.
Because piling forms a critical part of the building foundations, the project team selected Cortec® MCI® technology to provide corrosion protection within the piling concrete.
In total, the project incorporated MCI®-2005 into more than 15,000 m³ of piling concrete.
Reinforcing steel provides strength to concrete piles. However, corrosion can affect embedded reinforcement and reduce the long-term durability of reinforced concrete.
Therefore, concrete piling corrosion protection can form part of the original construction strategy. By incorporating corrosion protection during concrete placement, project teams can address reinforcement protection from the beginning.
For the Deira Waterfront Development, the project team selected MCI®-2005 based on its proven effectiveness.
The project used Cortec® MCI® technology in the piling works.
The team incorporated MCI®-2005 into the piling concrete. Overall, more than 15,000 m³ of concrete received the product.
As a result, the project integrated corrosion protection directly into a substantial volume of piling concrete.
The project team needed a proven product for the piling works. Therefore, they selected MCI®-2005.
Rather than treating the concrete after construction, the team incorporated the product during the piling phase. This approach made concrete piling corrosion protection part of the original construction process.
Furthermore, the application covered more than 15,000 m³ of piling concrete across the development.
Proven Effectiveness
The proven effectiveness of MCI®-2005 was the main reason for selecting it for this project.
Large-Scale Application
The project used MCI®-2005 in more than 15,000 m³ of piling concrete. Therefore, the product formed a significant part of the piling works.
Protection During Construction
The project team incorporated MCI®-2005 into the piling concrete during construction. Consequently, the corrosion protection strategy became part of the original concrete works.
Suitable for a Mixed-Use Development
The development includes hotel, commercial, residential, and retail buildings. As a result, the piling works support several different building uses within the same development.
A planned concrete piling corrosion protection strategy helps project teams address reinforcement protection during construction.
In this project, MCI®-2005 formed part of the piling works across a large volume of concrete. Moreover, selecting a proven corrosion inhibitor allowed the project team to establish its protection strategy from the foundation stage.
The application demonstrates how corrosion protection can become an integral part of major reinforced concrete construction projects.
The Deira Waterfront Development used MCI®-2005 in more than 15,000 m³ of piling concrete.
The project team selected the product because of its proven effectiveness. Furthermore, using MCI®-2005 during piling integrated corrosion protection directly into the foundation construction process.
Overall, the concrete piling corrosion protection strategy supported the project’s approach to protecting reinforced concrete from the earliest stage of construction.
What is concrete piling corrosion protection?
Concrete piling corrosion protection focuses on protecting reinforcing steel within the concrete piles against corrosion.
Which corrosion inhibitor did the project use?
The project used MCI®-2005 in the piling concrete.
How much concrete incorporated MCI®-2005?
The project used MCI®-2005 in more than 15,000 m³ of piling concrete.
Why was MCI®-2005 selected?
The project selected MCI®-2005 because of its proven effectiveness.
What buildings are included in the development?
The project includes four buildings with hotel, commercial, residential, and retail spaces.
Concrete Supplier: Reem Readymix
Consultant: MZ Architects