Electric transmission support poles are typically made of precast concrete. Over years of exposure to chloride and carbonation attack, concrete spalls and cracks developed on many of the poles. These spalling cracks compromised the poles’ ability to structurally support their loads. The rural location of the poles also made access difficult, adding logistical challenges to an already urgent repair need.
Transmission poles often stand in exposed, rural locations for decades. During this time, they endure constant environmental attack with minimal inspection or maintenance access. Chloride exposure and carbonation gradually break down the concrete’s protective chemistry around the embedded rebar, eventually triggering corrosion. As the steel corrodes, it expands, and this expansion cracks and spalls the surrounding concrete, weakening the pole exactly where it needs to bear load.
Because these poles sit in remote areas, full replacement isn’t just expensive in materials and labor. It also requires specialized equipment and access logistics that drive costs even higher. As a result, an effective in-place repair strategy becomes especially valuable for utility companies managing large numbers of poles across dispersed rural networks.
The repair team followed a multi-step process designed to restore structural integrity while protecting the poles from future corrosion.
First, technicians removed the loose, damaged sections of concrete to expose the underlying rebar and create a clean repair surface. Next, they brush-applied VpCI®-386 directly to the exposed rebar, providing immediate corrosion protection before further repair work began. The team then added MCI®-2000 to the repair mortar used to rebuild the damaged area, ensuring the new concrete carried built-in corrosion protection. Finally, they brush-applied a cementitious coating of MCI®-2020, along with a cement wash, as a finish coat. This added an extra layer of protection while also restoring an aesthetically pleasing appearance to the repaired pole.
Why VpCI®-386:
Applied directly to the exposed rebar, this coating provides immediate corrosion protection at the most vulnerable point in the repair — the steel itself — before new concrete even covers it.
Why MCI®-2000:
By mixing this Migrating Corrosion Inhibitor directly into the repair mortar, the team ensured the newly poured concrete offered built-in, long-term protection against future chloride and carbonation attack. This eliminated the need to rely solely on the original mix design.
Why MCI®-2020:
As a finishing coat, MCI®-2020 delivers an additional migrating corrosion inhibitor layer across the entire repaired surface. This extends protection beyond just the repaired section and improves the pole’s overall resistance to future environmental attack.
Replacing a power pole in the field would have cost $900. Instead, the team used Cortec’s MCI®-2000, MCI®-2020, and VpCI®-386 to restore the poles to nearly new condition. The total cost came to just $250 — a savings of $650 per pole.
This project demonstrates how targeted concrete repair, combined with corrosion inhibiting technology, can extend the service life of remote infrastructure at a fraction of replacement cost. For utility companies managing large pole networks, this approach offers several practical advantages: