Hospital concrete corrosion protection formed part of the construction strategy for a major healthcare development that includes a 300-bed teaching hospital and a medical college.
The development covers approximately 150,000 m² of land. Given the scale of the project, the team selected Cortec® MCI®-2005 for use in the concrete substructure.
In total, the project incorporated MCI®-2005 into approximately 15,000 m³ of substructure concrete.
Reinforced concrete forms an important part of large healthcare developments. Therefore, protecting reinforcing steel against corrosion can support the long-term durability of the concrete structure.
By incorporating corrosion protection during construction, project teams can address reinforcement protection from the beginning.
For this development, the team selected MCI®-2005 based on its proven effectiveness.
The project team used Cortec® MCI® technology within the substructure.
They incorporated MCI®-2005 into approximately 15,000 m³ of substructure concrete.
As a result, hospital concrete corrosion protection became part of the original concrete construction strategy rather than a later remedial measure.
The project required a corrosion protection solution for a substantial volume of substructure concrete.
Therefore, the project team selected MCI®-2005. Its proven effectiveness was the main factor behind the decision to use it.
Furthermore, incorporating the product into the concrete allowed the project to include corrosion protection during the construction of the substructure.
Proven Effectiveness
The proven effectiveness of MCI®-2005 drove its selection for the project.
Large-Scale Application
The project used MCI®-2005 in approximately 15,000 m³ of substructure concrete.
Protection During Construction
The team incorporated MCI®-2005 into the substructure concrete during construction. Therefore, the corrosion protection strategy formed part of the original concrete work.
Suitable for a Major Healthcare Development
The development combines a 300-bed teaching hospital with a medical college across a 150,000 m² site.
A planned hospital concrete corrosion protection strategy allows developers to address reinforcement protection during the construction phase.
In this project, the team incorporated MCI®-2005 into a substantial volume of substructure concrete. Moreover, the product’s proven effectiveness supported its selection for the development.
This approach integrated corrosion protection directly into the substructure construction process.
The project team selected MCI®-2005 for the substructure of this major hospital and medical college development.
Overall, approximately 15,000 m³ of substructure concrete incorporated MCI®-2005. Its proven effectiveness was the key reason for selecting the product.
As a result, the hospital concrete corrosion protection strategy became part of the project from the substructure construction stage.
What is hospital concrete corrosion protection?
Hospital concrete corrosion protection focuses on protecting reinforcing steel within concrete against corrosion-related deterioration.
Which corrosion inhibitor did the project use?
The project used MCI®-2005 in the concrete substructure.
How much concrete incorporated MCI®-2005?
Approximately 15,000 m³ of substructure concrete incorporated MCI®-2005.
Why did the project select MCI®-2005?
The project team selected MCI®-2005 because of its proven effectiveness.
What does the development include?
The project includes a 300-bed teaching hospital and a medical college across approximately 150,000 m² of land.
Concrete Supplier: National Readymix
Client: Al Fardan Properties Co.
Consultant: Studio Altieri