Cortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notaglineCortec-Middle-East-logo-notagline
  • ABOUT US
    • VpCI® Technology
    • MCI® Technology
    • The Cortec® Story
    • Engineering and Field Service
    • Cortec® R&D
    • Asset Integrity Assurance
  • INDUSTRIES
    • Oil & Gas
      • Aboveground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
      • Rig Stacking
    • Manufacturing Industries
    • Construction
      • Reinforced Concrete Structures
      • Post-Tensioned Structures
      • Concrete Repair
    • Power & Water
      • Above-ground Storage Tanks
      • Equipment Preservation
      • Hydrotesting and Mothballing
      • Mothballing
      • Cased Pipeline Crossings
    • Aviation
  • PRODUCTS
    • All Purpose Lubricant
    • Surface Preparation
    • Rust Preventives
    • VpCI® Powder
    • VpCI® Additives
    • VpCI® Packaging
    • VpCI® Emitters
    • MCI® for Concrete
  • CONTACT US
Home  »  case studies   »   Fakeeh Academic Medical Center
Published by Cortec Middle East on December 11, 2019
Categories
  • case studies
Tags
Untitled design (15)

Fakeeh Academic Medical Center

Hospital Concrete Corrosion Protection with MCI®-2005

Overview

Hospital concrete corrosion protection formed part of the construction strategy for a major healthcare development that includes a 300-bed teaching hospital and a medical college.

The development covers approximately 150,000 m² of land. Given the scale of the project, the team selected Cortec® MCI®-2005 for use in the concrete substructure.

In total, the project incorporated MCI®-2005 into approximately 15,000 m³ of substructure concrete.

Why Hospital Concrete Corrosion Protection Matters

Reinforced concrete forms an important part of large healthcare developments. Therefore, protecting reinforcing steel against corrosion can support the long-term durability of the concrete structure.

By incorporating corrosion protection during construction, project teams can address reinforcement protection from the beginning.

For this development, the team selected MCI®-2005 based on its proven effectiveness.

Application

The project team used Cortec® MCI® technology within the substructure.

They incorporated MCI®-2005 into approximately 15,000 m³ of substructure concrete.

As a result, hospital concrete corrosion protection became part of the original concrete construction strategy rather than a later remedial measure.

Hospital Concrete Corrosion Protection with MCI®-2005

The project required a corrosion protection solution for a substantial volume of substructure concrete.

Therefore, the project team selected MCI®-2005. Its proven effectiveness was the main factor behind the decision to use it.

Furthermore, incorporating the product into the concrete allowed the project to include corrosion protection during the construction of the substructure.

Why MCI®-2005 Was Selected

Proven Effectiveness
The proven effectiveness of MCI®-2005 drove its selection for the project.

Large-Scale Application
The project used MCI®-2005 in approximately 15,000 m³ of substructure concrete.

Protection During Construction
The team incorporated MCI®-2005 into the substructure concrete during construction. Therefore, the corrosion protection strategy formed part of the original concrete work.

Suitable for a Major Healthcare Development
The development combines a 300-bed teaching hospital with a medical college across a 150,000 m² site.

Benefits of Hospital Concrete Corrosion Protection

A planned hospital concrete corrosion protection strategy allows developers to address reinforcement protection during the construction phase.

In this project, the team incorporated MCI®-2005 into a substantial volume of substructure concrete. Moreover, the product’s proven effectiveness supported its selection for the development.

This approach integrated corrosion protection directly into the substructure construction process.

Conclusion

The project team selected MCI®-2005 for the substructure of this major hospital and medical college development.

Overall, approximately 15,000 m³ of substructure concrete incorporated MCI®-2005. Its proven effectiveness was the key reason for selecting the product.

As a result, the hospital concrete corrosion protection strategy became part of the project from the substructure construction stage.

Why This Case Matters for Developers and Engineers

  • The development includes a 300-bed teaching hospital.
  • The project also includes a medical college.
  • The development covers approximately 150,000 m² of land.
  • MCI®-2005 was incorporated into the substructure.
  • Approximately 15,000 m³ of concrete included MCI®-2005.
  • Proven effectiveness drove the selection of the product.
  • The project integrated corrosion protection during construction.

Frequently Asked Questions

What is hospital concrete corrosion protection?
Hospital concrete corrosion protection focuses on protecting reinforcing steel within concrete against corrosion-related deterioration.

Which corrosion inhibitor did the project use?
The project used MCI®-2005 in the concrete substructure.

How much concrete incorporated MCI®-2005?
Approximately 15,000 m³ of substructure concrete incorporated MCI®-2005.

Why did the project select MCI®-2005?
The project team selected MCI®-2005 because of its proven effectiveness.

What does the development include?
The project includes a 300-bed teaching hospital and a medical college across approximately 150,000 m² of land.

Key Takeaways

  • The project includes a 300-bed teaching hospital and medical college.
  • The site covers approximately 150,000 m².
  • The team used MCI®-2005 in the project substructure.
  • Approximately 15,000 m³ of concrete incorporated MCI®-2005.
  • Proven effectiveness drove the product selection.
  • The project established hospital concrete corrosion protection during construction.

Project Partners

Concrete Supplier: National Readymix

Client: Al Fardan Properties Co.

Consultant: Studio Altieri

Cortec® Product Used

  • MCI®-2005
Contact Us
Share
0
Cortec Middle East

Related posts

High Rise Building Restoration

High Rise Building Restoration

September 23, 2025

High Rise Building Restoration


Read more
Protection of Electrical Cabinets

Protection of Electrical Cabinets

September 23, 2025

Protection of Electrical Cabinets


Read more
Cleaning and Preservation of Spare Parts

Cleaning and Preservation of Spare Parts

August 24, 2025

Cleaning and Preservation of Spare Parts


Read more

Comments are closed.

Cortec Middle East-logo

QUICK LINKS

  • → HOME
  • → ABOUT US
  • → INDUSTRIES
  • → PRODUCTS
  • → CAREER
  • → CONTACT US
  • → PRIVACY
  • → MEDIA

REQUEST A WEBINAR

REQUEST NOW

SOCIAL MEDIA

ADDRESS

CORTEC® MIDDLE EAST,
2411 Tower B, Jafza One,
Jebel Ali Freezone, DUBAI,
UNITED ARAB EMIRATES


TEL. +971 4 434 0669
FAX. +971 4 434 0668
INQUIRIES@CORTEC-ME.COM

Copyright Cortec® Middle East.
All rights reserved. Cortec®, MCI®, VpCI® 126-Blue®, EcoFilm®, EcoWorks®, Rawn® and Bull Frog® are registered trademarks of Cortec® Corporation.
    • No translations available for this page

      REQUEST A FREE SAMPLE



        Download Layup Manuals

          Select Manual* :


          Offshore Rig Layup PR




            Layup of Land Based Drilling Rigs PR




              Request a Quote


                Talk To Our Experts


                  Subscribe Now

                    Apply Now

                      Upload Your CV