Inspectors detected voids in the “stay” cables on the Cochrane Bridge in Mobile, Alabama. They used video scope inspection to examine the cables. Through this process, they found some cable strands exposed with no grout cover. As a result, these critical structural elements became vulnerable to corrosion.
Cable-stayed bridges rely on high-strength steel strands to carry significant structural loads. Typically, grout encases these strands to protect them from moisture and corrosion. When voids develop in this grout coverage, exposed cable strands lose their protective barrier entirely. This creates a direct pathway for corrosion to begin on components that are difficult and expensive to inspect or replace.
Because stay cables play such a critical structural role, any repair approach needs to restore both the physical grout coverage and the corrosion protection that coverage originally provided. Given the specialized nature of cable-stayed bridge construction, repair materials also need to integrate seamlessly with existing grouting systems. Otherwise, they risk compromising the grout’s essential performance characteristics.
The repair team began by measuring the voids. Next, they filled them using vacuum grouting methods, a technique well-suited to reaching enclosed cable spaces without disturbing the surrounding structure. To enhance corrosion protection, the Alabama Department of Transportation then approved using MCI® Mini Grenades alongside DSI’s DYNA Grout. This added an extra layer of protection to the standard grouting material.
Why MCI® Mini Grenades:
These products deliver concentrated Migrating Corrosion Inhibitor protection directly into the grout mixture. As a result, they enhance the corrosion resistance of the repair without requiring a separate application step. Because they integrate directly into the DYNA Grout during vacuum grouting, they protected the newly exposed cable strands as soon as the repair material filled the voids.
The MCI® Mini Grenades mixed well with the DYNA Grout and did not alter its flow properties. Thanks to this compatibility, the repair team could add corrosion protection to the grouting system without compromising the grout’s ability to properly fill and seal the cable voids.
This project demonstrates how a corrosion inhibitor can integrate directly into existing repair materials without disrupting their essential performance. For engineers and transportation departments managing cable-stayed bridge infrastructure, this case highlights several practical lessons: