Overview The project calls for the construction of 4 buildings within the Deira Waterfront Development. The buildings will house a hotel, commercial units, residential units, and […]
Challenge The customer is facing big challenge to overcome the corrosion problem on the internal surface of the valves after hydrotesting, also some corrosion usually noticed […]
Overview The project entails the construction of 300 bed teaching hospital and a medical college. The development spreads across 150,000 square meters of land. Application MCI®-2005 was […]
Challenge Company required the cleaning and long term, outdoor preservation of 1 Annular and 2 BOP NXT double bodies. The equipment was to be stored outdoors, […]
Challenge A leading refinery wanted to maintain the integrity of valuable assets and prevent deterioration due to corrosion whilst maintaining the operational readiness of equipment to […]
Challenge Ten heat recovery steam generation tube bundles were fabricated by STS in five different modular designs. The client required protection of the internal surfaces of […]
Challenge Abu Dhabi Reem Island has more than 100 towers consisting of 1.4 million square metres of office space, 850,000 square metres of retail and community […]
Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]