Problem The Rove Hotel is the first of five hotels being constructed by Emaar. These budget friendly hotels are located in Dubai Downtown, near Dubai Mall […]
Problem Several land rigs had finished contracts and needed preservation before being shipped back to home base. Application Cortec® products were established with a solid track […]
Problem The project consisted of three underground floors with proposed roof parking. The parking accounted for 813 car spaces in addition to a one-story temporary steel […]
Problem The customer was working to develop two oilfields in the Persian Gulf. Once all topside activities had been completed on the platforms and jackets, the […]
PROBLEM The client was developing the Mohammed Bin Rashid al-Maktoum Academic Medical City in Dubai Healthcare. This development includes the construction of the University Hospital built […]
Challenge Four land rigs had finished contracts and needed preservation before everything was packed up and shipped back to the home base. Application Cortec® products were […]
Challenge The Client had a large inventory of equipment in storage in need of corrosion protection. The warehouse is exposed to a harsh sea environment and […]
Challenge The client needed to preserve piping internals for JTubes on their jackets (support frames for offshore platforms) built for installation in an offshore field development […]