Challenge The client needed to preserve piping internals for JTubes on their jackets (support frames for offshore platforms) built for installation in an offshore field development […]
Challenge The client needed to mitigate corrosion of both external and internal metallic components and systems of a drilling rig in an aggressive marine environment throughout […]
Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]
Challenge One of the world’s leading, privately owned armored vehicles manufacturers. was facing flash rust issues at the initial stage of fabrication and required a solution […]
Challenge A major producer of oil and gas from the offshore areas of Abu Dhabi in the United Arab Emirates operates multiple barge-type offshore platforms constructed […]
Cortec’s MCI® 2005 was incorporated in the concrete mix design for the podium structure to achieve the desired 100 year service life. The building sits on […]
Challenge The customer is one of the leading natural gas processing companies in Dubai. Dubai Petroleum supplied the feed for the plant until 2011 when they […]
Problem The customer had procured and stored 19 spare subsea pipeline connectors for several years without protection. Upon inspecting the connectors, they were found to be […]
Challenge The project is located very close to the sea, where the salinity level in the ground water table is high. This prestigious project consists of […]