February 11, 2020

Port Views Residence

Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]
December 14, 2019

Armored Vehicles Surface Treatment

Challenge One of the world’s leading, privately owned armored vehicles manufacturers. was facing flash rust issues at the initial stage of fabrication and required a solution […]
December 14, 2019

Offshore Caisson Legs Protection

Challenge A major producer of oil and gas from the offshore areas of Abu Dhabi in the United Arab Emirates operates multiple barge-type offshore platforms constructed […]
December 14, 2019

Burj Khalifa

Cortec’s MCI® 2005 was incorporated in the concrete mix design for the podium structure to achieve the desired 100 year service life. The building sits on […]
December 14, 2019

Gas Plant Mothballing

Challenge The customer is one of the leading natural gas processing companies in Dubai. Dubai Petroleum supplied the feed for the plant until 2011 when they […]
December 14, 2019

Subsea Connectors Preservation

Problem The customer had procured and stored 19 spare subsea pipeline connectors for several years without protection. Upon inspecting the connectors, they were found to be […]
December 14, 2019

Raha Beach Development

Challenge The project is located very close to the sea, where the salinity level in the ground water table is high. This prestigious project consists of […]
December 14, 2019

Rotor Preservation

Challenge One of the leading companies wanted to preserve a recently refurbished rotor for a maximum period of two years until it was put back into […]
December 14, 2019

Boiler Tube Preservation

Challenge The customer had procured two spare boiler tube bundles and faced a serious challenge in preventing the progress of corrosion during the outdoor storage of […]