December 24, 2020

Preserving Damaged Rebar in Dubai Creek Harbor Utility Project

Problem Epoxy coated rebars were damaged during installation, which led to further damage of the epoxy coating. Cortec® engineers visited the premises to assess the damage […]
December 15, 2020

Rove Hotel Application

Problem The Rove Hotel is the first of five hotels being constructed by Emaar. These budget friendly hotels are located in Dubai Downtown, near Dubai Mall […]
August 11, 2020

Preservation of Land Rig in Algeria

Problem Several land rigs had finished contracts and needed preservation before being shipped back to home base. Application Cortec® products were established with a solid track […]
July 23, 2020

Multi-Level Parking Structure Preservation

Problem The project consisted of three underground floors with proposed roof parking. The parking accounted for 813 car spaces in addition to a one-story temporary steel […]
July 20, 2020

Preservation of Subsea Pipelines

Problem The customer was working to develop two oilfields in the Persian Gulf. Once all topside activities had been completed on the platforms and jackets, the […]
July 14, 2020

New Construction Preservation Using MCI® CorShield®

PROBLEM The client was developing the Mohammed Bin Rashid al-Maktoum Academic Medical City in Dubai Healthcare. This development includes the construction of the University Hospital built […]
July 5, 2020

Preservation of Land Rig in Kuwait

Challenge Four land rigs had finished contracts and needed preservation before everything was packed up and shipped back to the home base. Application Cortec® products were […]
June 25, 2020

Power Plant Equipment Preservation

Challenge The Client had a large inventory of equipment in storage in need of corrosion protection. The warehouse is exposed to the harsh sea environment and […]
June 16, 2020

Preservation of Jack-Up Rig

Challenge The client’s rig did not take a new contract and was expected to be idle for at least twelve months. The client decided to cold […]