July 14, 2020

New Construction Preservation Using MCI® CorShield®

PROBLEM The client was developing the Mohammed Bin Rashid al-Maktoum Academic Medical City in Dubai Healthcare. This development includes the construction of the University Hospital built […]
July 5, 2020

Preservation of Land Rig in Kuwait

Challenge Four land rigs had finished contracts and needed preservation before everything was packed up and shipped back to the home base. Application Cortec® products were […]
June 25, 2020

Power Plant Equipment Preservation

Challenge The Client had a large inventory of equipment in storage in need of corrosion protection. The warehouse is exposed to the harsh sea environment and […]
June 16, 2020

Preservation of Jack-Up Rig

Challenge The client’s rig did not take a new contract and was expected to be idle for at least twelve months. The client decided to cold […]
June 10, 2020

Preservation of J-Tubes on Offshore Jackets

Challenge The client needed to preserve piping internals for JTubes on their jackets (support frames for offshore platforms) built for installation in an offshore field development […]
June 8, 2020

Cold Stack Preservation of Jack-Up Rig

Challenge The client needed to mitigate corrosion of both external and internal metallic components and systems of a drilling rig in an aggressive marine environment throughout […]
February 11, 2020

Port Views Residence

Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]
December 14, 2019

Armored Vehicles Surface Treatment

Challenge One of the world’s leading, privately owned armored vehicles manufacturers. was facing flash rust issues at the initial stage of fabrication and required a solution […]
December 14, 2019

Offshore Caisson Legs Protection

Challenge A major producer of oil and gas from the offshore areas of Abu Dhabi in the United Arab Emirates operates multiple barge-type offshore platforms constructed […]