August 11, 2020

Preservation of Land Rig in Algeria

Problem Several land rigs had finished contracts and needed preservation before being shipped back to home base. Application Cortec® products were established with a solid track […]
July 23, 2020

Multi-Level Parking Structure Preservation

Problem The project consisted of three underground floors with proposed roof parking. The parking accounted for 813 car spaces in addition to a one-story temporary steel […]
July 20, 2020

Preservation of Subsea Pipelines

Problem The customer was working to develop two oilfields in the Persian Gulf. Once all topside activities had been completed on the platforms and jackets, the […]
July 14, 2020

New Construction Preservation Using MCI® CorShield®

PROBLEM The client was developing the Mohammed Bin Rashid al-Maktoum Academic Medical City in Dubai Healthcare. This development includes the construction of the University Hospital built […]
July 5, 2020

Preservation of Land Rig in Kuwait

Challenge Four land rigs had finished contracts and needed preservation before everything was packed up and shipped back to the home base. Application Cortec® products were […]
June 25, 2020

Power Plant Equipment Preservation

Challenge The Client had a large inventory of equipment in storage in need of corrosion protection. The warehouse is exposed to the harsh sea environment and […]
June 16, 2020

Preservation of Jack-Up Rig

Challenge The client’s rig did not take a new contract and was expected to be idle for at least twelve months. The client decided to cold […]
June 10, 2020

Preservation of J-Tubes on Offshore Jackets

Challenge The client needed to preserve piping internals for JTubes on their jackets (support frames for offshore platforms) built for installation in an offshore field development […]
June 8, 2020

Cold Stack Preservation of Jack-Up Rig

Challenge The client needed to mitigate corrosion of both external and internal metallic components and systems of a drilling rig in an aggressive marine environment throughout […]