February 11, 2020

Port Views Residence

Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]
December 14, 2019
Armored Vehicles Surface Treatment

Armored Vehicles Surface Treatment

Challenge STREIT Group is one of the world’s leading, privately owned armored vehicles manufacturers. The company was facing flash rust issues at the initial stage of […]
December 14, 2019
Offshore Caisson Legs Protection

Offshore Caisson Legs Protection

Challenge Abu Dhabi Marine Operating Company (ADMA-OPCO) is a major producer of oil and gas from the offshore areas of Abu Dhabi in the United Arab […]
December 14, 2019
Burj Khalifa

Burj Khalifa

Cortec’s MCI® 2005 was incorporated in the concrete mix design for the podium structure to achieve the desired 100 year service life. The building sits on […]
December 14, 2019
Gas Plant Mothballing

Gas Plant Mothballing

Challenge The customer is one of the leading natural gas processing companies in Dubai. Dubai Petroleum supplied the feed for the plant until 2011 when they […]
December 14, 2019
Subsea Connectors Preservation

Subsea Connectors Preservation

Problem The customer had procured and stored 19 spare subsea pipeline connectors for several years without protection. Upon inspecting the connectors, they were found to be […]
December 14, 2019
Raha Beach Development

Raha Beach Development

Challenge The project is located very close to the sea, where the salinity level in the ground water table is high. This prestigious project consists of […]
December 14, 2019
Rotor Preservation

Rotor Preservation

Challenge The customer wanted to preserve a recently refurbished rotor for a maximum period of two years until it was put back into service. The rotor […]
December 14, 2019
Boiler Tube Preservation

Boiler Tube Preservation

Challenge The customer had procured two spare boiler tube bundles and faced a serious challenge in preventing the progress of corrosion during the outdoor storage of […]
December 14, 2019
Critical Spares Preservation

Critical Spares Preservation

Challenge SCIPCO had a huge inventory of unprotected equipment in their warehouse. The warehouse is located close to the sea resulting in the equipment rusting. The […]
December 14, 2019
Gtl Module Preservation

Gtl Module Preservation

Challenge Kellogg’s Brown & Root (KBR) fabricated 27 gas to liquid modules at Gulf Piping Company in Abu Dhabi for Escravos, Nigeria. After completion, the fabricated […]
December 14, 2019
Pipe Spool Preservation

Pipe Spool Preservation

Challenge The customer needed to prevent the progession of corrosion to the interior of 60 pipes during several years of storage, as a back up for […]
December 14, 2019
Offshore Platform Preservation

Offshore Platform Preservation

Challenge A new Cortec® customer needed to store equipment for one year, on the deck of an offshore platform. Exposure to salt water spray, sand, shot […]
December 11, 2019
Runib Switchyard Foundation Repair

Runib Switchyard Foundation Repair

Challenge The concrete foundations at PDO’s Runib Switchyard were experiencing visible cracking, spalling, and delamination. The structures were over twenty years old, with repairs made in […]
December 11, 2019
Vida Residence Downtown

Vida Residence Downtown

Challenge The project calls for the construction of a 57-storey serviced apartment tower with 320 units of 1, 2, 3 & 4 bedrooms located on Mohammed […]
December 11, 2019
Burj Alfardan

Burj Alfardan

Overview Alfardan mixed use tower in the commercial area of Marina District, Lusail City encompasses a plot area of 12,541m². The overall design of the structure […]
December 11, 2019
Al Majed Tower

Al Majed Tower

Overview The under construction Al Majed Tower is a commercial tower in the Marina District of Lusail. It will comprise of 4 Basement + Ground + […]
December 11, 2019
Reem Island

Reem Island

Overview Abu Dhabi Reem Island has more than 100 towers consisting of 1.4 million square metres of office space, 850,000 square metres of retail and community […]
December 11, 2019
Preservation of synchronous motor generator & accessories

Preservation of synchronous motor generator & accessories

Challenge Zadco is one of the largest offshore oil producing companies of ADNOC group. The Delta project was executed by Zadco a year ago where large […]
December 11, 2019
Cleaning Of Crude Oil Compressor

Cleaning Of Crude Oil Compressor At Adco By Serck Services Using Cortec-Vpci Products

Challenge Serck Services needs a solution to clean the internals of a compressor tank and associated piping mainly to remove the crude oil sludge without causing […]
December 11, 2019
Gas Injection Platform (Gip) Preservation For Dubai Petroleum By Lamprell

Gas Injection Platform (Gip) Preservation For Dubai Petroleum By Lamprell

Challenge Lamprell needs a solution to provide protection against corrosion and mechanical / physical damage caused during construction before the gas injection platform sets sail. Application […]
December 11, 2019
shrink wrapping

Shrink Wrapping For Gas Turbines

Challenge The client requested a protective packaging solution to protect large gas turbines and compressors during the period of storage and transit before they are installed […]
December 11, 2019
PRESERVATION OF CRUDE OIL & GAS MODULES

PRESERVATION OF CRUDE OIL & GAS MODULES BY GPC THROUGH PETROFAC TO ZADCO

Challenge GPC needed to preserve piping internals for Preassembled Racks (PARs) and Preassembled Modules (PAMs) for the Zadco’s UZ-750 project in UAE. Modules were fabricated onshore […]
December 11, 2019
taj-hotel-jlt

Vivanta by Taj Hotel in JLT

Overview The project calls for the construction of a 207 room, 5-star hotel in on Plot No. 3935794 in Jumeirah Lake Towers (JLT) development. The high […]
December 11, 2019
Preservation of Crude Oil & Gas Modules

Preservation of Crude Oil & Gas Modules by Lamprell through Petrofac to ZADCO

Challenge L&T needed to preserve piping internals for Preassembled Modules (PAMs) for the Zadco’s UZ-750 project in UAE. Modules were fabricated onshore and sailed to the […]
December 11, 2019
Park View Saadiyat

Park View Saadiyat

Overview The project calls for the construction of 4 buildings within the Deira Waterfront Development. The buildings will house a hotel, commercial units, residential units, and […]
December 11, 2019
CorroLogic®: A Logical Solution to Soil-Side Corrosion Challenges on Aboveground Storage Tanks!

Fuel Storage Tank Preservation

Challenge The client requested to preserve the internals of two Tanks while they are empty, each tank is 3,800m³ in volume and 21.3m Dia & 14.7m […]
December 11, 2019
Protect the valves during hydro-testing and transportation

Protect the valves during hydro-testing and transportation

Challenge The customer is facing big challenge to overcome the corrosion problem on the internal surface of the valves after hydrotesting, also some corrosion usually noticed […]
December 11, 2019
Fakeeh Academic Medical Center

Fakeeh Academic Medical Center

Overview The project entails the construction of 300 bed teaching hospital and a medical college. The development spreads across 150,000 square meters of land. Application MCI®-2005 was […]
December 11, 2019

Preservation of BOP Equipment

Challenge ENSCO required the cleaning and long term, outdoor preservation of 1 Annular and 2 BOP NXT double bodies. The equipment was to be stored outdoors, […]
December 11, 2019
Inventory Preservation - Part 1

Inventory Preservation – Part 1

Challenge A leading refinery wanted to maintain the integrity of valuable assets and prevent deterioration due to corrosion whilst maintaining the operational readiness of equipment to […]
December 11, 2019
Preservation of Heat Recovery Steam Generation Tube Bundles

Preservation of Heat Recovery Steam Generation Tube Bundles

Challenge Ten heat recovery steam generation tube bundles were fabricated by STS in five different modular designs. The client required protection of the internal surfaces of […]
December 11, 2019
Wet Lay-up of District Cooling Plant

Wet Lay-up of District Cooling Plant

Challenge Abu Dhabi Reem Island has more than 100 towers consisting of 1.4 million square metres of office space, 850,000 square metres of retail and community […]
December 11, 2019
port views residence

Port Views Residence

Overview The project calls for the construction of four basement + ground + 6-storey + health club residential buildings in Dry Docks area of Dubai. Application […]
October 14, 2019
The Warsan Souk

The Warsan Souk

The Warsan Souk Overview The project calls for the construction of 591 retail units, 26 food and beverage units, and 175 townhouses. The total built up […]
October 14, 2019
Deira Waterfront Redevelopment – Plot 3 & 4

Deira Waterfront Redevelopment – Plot 3 & 4

Deira Waterfront Redevelopment – Plot 3 & 4 Overview The project calls for the construction of  buildings within the Deira Waterfront Development. The buildings will house […]